January 7, 2025
The Palisades Fire, and what comes after it
The Palisades Fire started on January 7, 2025, in Pacific Palisades. This page is for homeowners who are ready to think about the lot again. It is not a news recap and it is not a claim about your insurance.
What is established
CAL FIRE records the Palisades Fire as a wildfire that began on January 7, 2025, southeast of Palisades Drive in Pacific Palisades, Los Angeles County. The incident page is fire.ca.gov/incidents/2025/1/7/palisades-fire. Structure counts and other totals on that page changed while the fire was active. This website does not reprint a damage total, because a mid-incident number is not a final account of your block.
Many families lost houses. If that is your situation, you do not have to tour a map of loss to start planning. The address lookup here is limited to burned homes that do not yet have a building application on file. It shows the lot and a planning estimate. It does not show who lives there.
The fire and the rebuild are different jobs
Clearing debris, talking with an insurer, and deciding whether to rebuild are not the same task as drawing a house. A survey, a soil report, and a set of plans answer questions about the ground and the building. They do not decide a claim, and they do not replace a City approval.
The City of Los Angeles publishes its own rebuilding steps at recovery.lacity.gov/rebuilding. Read that page before you rely on any summary, including this one. Palisades Plans is not a City department and does not issue permits.
What you can do before you are sure
- Look up the address and see the public lot size, zoning, and the earlier building area.
- Treat the living-area figure as a preliminary envelope, not the house you must build.
- Leave planning services unchecked if you do not want them priced.
- Call or email when you want a person. Looking up the lot does not start work.
Hillside lots are common in the Palisades. Slope, streets, and the exact zone can change what fits. The number on a property page uses the lot and the setbacks on file, and for hillside R1 zones it uses the gentlest published slope band because the slope itself is not stored here. A steeper lot is usually allowed less.
Keep reading
How a rebuild is usually sequenced · The building process · Find your address